Date |
Operational? |
Description/reason |
Last updated by |
June 23, 2025, 3:29 p.m. |
Yes |
Suntracker is operation after doing reset on tracker electronics box. Measurements resumed. |
orfeo |
June 20, 2025, 6:18 p.m. |
No |
We've lost contact with the suntracker but hope a quick physical reset of the tracker will return operations |
orfeo |
May 15, 2025, 9 p.m. |
Yes |
Suntracker operational and blockage removed from emission input. overpasses welcome. |
orfeo |
May 14, 2025, 8:09 p.m. |
No |
Bruker A547-N Suntracker operational but emission periscope/ray connector is blocked - no measurements |
orfeo |
May 13, 2025, 9:03 p.m. |
No |
Bruker A547-N Suntracker no operational - investigating |
orfeo |
Oct. 3, 2024, 6:39 p.m. |
Yes |
As of September 24, 2024, measurements can be made remotely using OPUS; work is continuing on development of HERC/OWL system |
strong |
Oct. 3, 2024, 6:37 p.m. |
No |
September 13-23, 2024: Site visit including 125HR alignment by Gregor Surawicz |
strong |
Oct. 3, 2024, 6:36 p.m. |
No |
July 22 - August 7, 2024: Site visit, including installation of IFS 125HR in customized container with Kevin Loran and Kamran Vosoughi |
strong |
Oct. 3, 2024, 6:34 p.m. |
No |
May 23-28, 2024: Initial site visit to Cambridge Bay to prepare for summer installation |
strong |