| Date | Operational? | Description/reason | Last updated by |
Typical Non-Operational Days |
Planned Non-Operational Dates |
|---|---|---|---|---|---|
| March 24, 2026, 3:46 p.m. | Yes | suntracker issues mostly fixed, motors can still seize up but we have a method for getting them going remotely. | orfeo | ||
| Feb. 6, 2026, 2:16 p.m. | No | Suntracker enclosure having issue with post winter startup, investigating | orfeo | ||
| Sept. 20, 2025, 1:31 p.m. | Yes | Bruker Suntracker Electronics A547n unit replaced withi spare, suntracker operational. | orfeo | ||
| Sept. 8, 2025, 8:14 p.m. | No | Suntracker not initialising, camera of camtracker not connected, contacting bruker | orfeo | ||
| Aug. 27, 2025, 7:25 p.m. | Yes | suntracker enclosure power restored (batteries replaced) solar measurements resume. | orfeo | ||
| Aug. 25, 2025, 9:20 p.m. | No | currently non-operational due to power failure to suntracker cover | e_mcgee | ||
| July 15, 2025, 1:43 p.m. | Yes | suntracker operation returned on 14th July 2025 @ 16:22 UTC | orfeo | ||
| July 14, 2025, 1:29 p.m. | No | Suntracker lost communications . need to reset device with onsite help. | orfeo | ||
| June 23, 2025, 3:29 p.m. | Yes | Suntracker is operation after doing reset on tracker electronics box. Measurements resumed. | orfeo | ||
| June 20, 2025, 6:18 p.m. | No | We've lost contact with the suntracker but hope a quick physical reset of the tracker will return operations | orfeo | ||
| May 15, 2025, 9 p.m. | Yes | Suntracker operational and blockage removed from emission input. overpasses welcome. | orfeo | ||
| May 14, 2025, 8:09 p.m. | No | Bruker A547-N Suntracker operational but emission periscope/ray connector is blocked - no measurements | orfeo | ||
| May 13, 2025, 9:03 p.m. | No | Bruker A547-N Suntracker no operational - investigating | orfeo | ||
| Oct. 3, 2024, 6:39 p.m. | Yes | As of September 24, 2024, measurements can be made remotely using OPUS; work is continuing on development of HERC/OWL system | strong | ||
| Oct. 3, 2024, 6:37 p.m. | No | September 13-23, 2024: Site visit including 125HR alignment by Gregor Surawicz | strong | ||
| Oct. 3, 2024, 6:36 p.m. | No | July 22 - August 7, 2024: Site visit, including installation of IFS 125HR in customized container with Kevin Loran and Kamran Vosoughi | strong | ||
| Oct. 3, 2024, 6:34 p.m. | No | May 23-28, 2024: Initial site visit to Cambridge Bay to prepare for summer installation | strong |