June 18, 2025, 5:52 p.m. |
Yes |
The system is back up and running on the InGaAs detector only. |
dwunch |
May 27, 2025, 12:11 a.m. |
No |
Fire has at least knocked out power, if not burned down the whole lab. |
dwunch |
May 25, 2025, 2:14 a.m. |
Yes |
Wildfires are burning very close to ETL (16 km away). Power lines have burned down, so we are watching carefully. |
dwunch |
May 24, 2025, 11:15 p.m. |
No |
Fires in the area have burned down power poles, so there is no power to the area and no estimated time for power to return. |
dwunch |
July 16, 2024, 1:26 a.m. |
Yes |
|
dwunch |
May 26, 2024, 2:02 p.m. |
Yes |
|
dwunch |
May 16, 2024, 9:01 p.m. |
No |
Blockage in light beam. |
dwunch |
May 3, 2024, 10:53 p.m. |
Yes |
Laser is limping along... |
dwunch |
April 25, 2024, 10:44 p.m. |
No |
Laser failure |
dwunch |
March 6, 2023, 5:42 p.m. |
Yes |
|
dwunch |
March 6, 2023, 2:14 a.m. |
No |
125HR is currently unreachable. |
dwunch |
Feb. 22, 2023, 11:42 p.m. |
Yes |
Laser replaced and IFS realigned. Hoping everything is working well again! |
dwunch |
Aug. 13, 2022, 12:44 p.m. |
No |
Looks like the laser just died - two EM27/SUNs will be at ETL from Aug 15-22. |
dwunch |
Aug. 4, 2022, 1:52 p.m. |
Yes |
Two EM27s will be visiting ETL August 15-22. |
dwunch |
March 17, 2022, 1:49 a.m. |
Yes |
|
dwunch |
Jan. 20, 2022, 1:45 a.m. |
Yes |
|
dwunch |
July 29, 2021, 12:06 p.m. |
Yes |
|
dwunch |
July 24, 2021, 1:09 a.m. |
No |
Suntracker enclosure unreachable |
dwunch |
July 10, 2021, 5:21 p.m. |
Yes |
|
dwunch |
July 10, 2021, 12:18 p.m. |
No |
Suntracker enclosure unreachable |
dwunch |
June 18, 2021, 2:18 p.m. |
Yes |
|
dwunch |
June 16, 2021, 5:41 p.m. |
No |
Tracker unreachable |
dwunch |
May 28, 2021, 1:16 a.m. |
Yes |
|
dwunch |
Dec. 30, 2020, 2:44 a.m. |
Yes |
Norhof isn't working quite right\, but the system is collecting data. |
dwunch |
Dec. 17, 2020, 8:48 p.m. |
Yes |
|
dwunch |
Dec. 17, 2020, 1:02 p.m. |
No |
Herc is inaccessible. |
dwunch |
Dec. 16, 2020, 8:36 p.m. |
Yes |
|
dwunch |
Oct. 20, 2020, 8:15 p.m. |
Yes |
|
dwunch |
July 9, 2020, midnight |
Yes |
|
dwunch |
June 1, 2020, midnight |
Yes |
Recovered from power failure. |
dwunch |
May 31, 2020, midnight |
No |
Power failure at ETL; need to restart the scanner. |
dwunch |
Feb. 18, 2020, midnight |
Yes |
|
dwunch |
May 16, 2019, midnight |
Yes |
Sunlight blockage resolved. |
dwunch |
May 13, 2019, midnight |
No |
Sunlight not properly entering IFS. |
dwunch |
April 15, 2019, midnight |
Yes |
|
dwunch |
April 14, 2019, midnight |
No |
The enclosure is not registering closed (even though it is), so the system is in failure mode. |
dwunch |
March 26, 2019, midnight |
Yes |
Planned power outage on Tuesday, March 26 from 10am-11am has been canceled. |
dwunch |
March 24, 2019, midnight |
Yes |
Planned power outage on Tuesday, March 26 from 10am-11am. |
dwunch |
Oct. 18, 2018, midnight |
Yes |
|
dwunch |
Aug. 18, 2018, midnight |
Yes |
InGaAs and InSb working. |
dwunch |
July 20, 2018, midnight |
Yes |
Power restored at ETL; still operational only on InGaAs detector. |
dwunch |
July 20, 2018, midnight |
No |
Power outage at ETL |
dwunch |
July 7, 2018, midnight |
Yes |
We're operational on the InGaAs detector, but have run out of LN2 until we replace a part on the generator. |
dwunch |
July 4, 2018, midnight |
No |
Power outage at ETL |
dwunch |
May 14, 2018, midnight |
Yes |
We're operational on the InGaAs detector, but have run out of LN2 until we replace a part on the generator. |
dwunch |
March 1, 2018, midnight |
Yes |
|
dwunch |
Feb. 3, 2018, midnight |
Yes |
Ice blockage on tracker removed. |
dwunch |
Feb. 2, 2018, midnight |
No |
Tracker is not turning in azimuth |
dwunch |
Dec. 28, 2017, midnight |
Yes |
Realigned and operational as of December 21. |
dwunch |
Dec. 19, 2017, midnight |
No |
Down for realignment visit. |
dwunch |
Dec. 6, 2017, midnight |
No |
We're taking measurements, but the ILS is unacceptable. |
dwunch |
Oct. 16, 2017, midnight |
Yes |
Maintenance trip complete. |
dwunch |
Oct. 10, 2017, midnight |
No |
Maintenance trip underway. |
dwunch |
Sept. 25, 2017, midnight |
Yes |
Note: planned maintenance trip October 5-11, 2017 |
dwunch |
Aug. 24, 2017, midnight |
Yes |
Back in play after a hard reboot of the IFS control computer. |
dwunch |
Aug. 24, 2017, midnight |
No |
Cannot communicate with the IFS. Probably needs a reboot. |
dwunch |
Aug. 2, 2017, midnight |
Yes |
Temperatures in the lab have returned to normal. |
dwunch |
July 28, 2017, midnight |
No |
Laser cannot lock due to heat inside lab. (Air conditioners not keeping up with pump heat.) |
dwunch |
June 9, 2017, midnight |
Yes |
|
dwunch |
April 19, 2017, midnight |
Yes |
|
dwunch |
March 31, 2017, midnight |
Yes |
We seem to be back in business. IFS is not fully evacuated, but that shouldn't be a problem for Xco2. |
dwunch |
March 30, 2017, midnight |
No |
The new suntracker controller was installed, but it hasn't been sunny to check to ensure that the system is operational. |
dwunch |
March 23, 2017, midnight |
No |
Suntracker amplifier is blown - we hope to install a new controller early next week. |
dwunch |
March 10, 2017, midnight |
No |
Suntracker will not initialize. |
dwunch |
Feb. 8, 2017, midnight |
Yes |
Enclosure batteries have been swapped; pumpdown still slow |
dwunch |
Feb. 1, 2017, midnight |
Yes |
Enclosure batteries need swapping; pump still slow |
dwunch |
Oct. 3, 2016, midnight |
No |
Instrumentation installed, but still working out some bugs. |
dwunch |
June 15, 2016, midnight |
No |
We plan to install the station in late September. |
dwunch |
May 24, 2016, midnight |
No |
We plan to install the station in late August/early September. |
dwunch |