Date |
Operational? |
Description/reason |
Last updated by |
Dec. 8, 2022, 2:45 p.m. |
Yes |
Operational since Nov15, 2022 after new laser setup, sun-tracker mirrors replacement, protective glass cover removal from sun-tracker |
k_shiomi |
Dec. 8, 2022, 2:11 p.m. |
Yes |
|
k_shiomi |
Oct. 21, 2022, 1:16 a.m. |
No |
Laser has not worked since 07UTC Oct14, 2022. It will be replaced on Nov14. |
k_shiomi |
March 30, 2021, 10:57 a.m. |
Yes |
Operational, the barometer was renewed on Mar29, 2021 |
k_shiomi |
March 20, 2021, 2:18 p.m. |
Yes |
Operational, but not operational on Mar29-30 due to the Meteorological station maintenance work |
k_shiomi |
March 12, 2021, 3:22 a.m. |
Yes |
Operational, but not operational on Mar18-19 due to the FTS maintenance work |
k_shiomi |
Feb. 10, 2021, 5:21 a.m. |
Yes |
Operational |
k_shiomi |
Jan. 14, 2021, 6:57 a.m. |
Yes |
Operational, but not operational on Feb06-07, 2021 due to scheduled power outage |
k_shiomi |
April 24, 2020, midnight |
Yes |
Normal operation from March 20, 2020 |
k_shiomi |
March 12, 2020, midnight |
No |
A new laser was installed on March 5. But, the solar tracker does not work because of a new GPS install failure. It will be fixed by the end of March. |
k_shiomi |
Jan. 15, 2017, midnight |
Yes |
The vacuum pump was repaired on January 5, 2016. (1 atm operation from 20150920 to 20160105) |
k_shiomi |
Sept. 20, 2016, midnight |
Yes |
The vacuum pump stopped. We will continue measurements at 1 atm (internal pressure of the FTS) for the time being. |
kawakami |
Aug. 5, 2016, midnight |
Yes |
The sliding roof has been repaired. Appear back to normal on Aug. 6 |
kawakami |
June 29, 2016, midnight |
No |
The sliding roof of the solar tracker is malfunctioned since June 18, 2016. |
kawakami |
Dec. 14, 2015, midnight |
Yes |
A new laser was installed on Dec 14. |
kawakami |
Nov. 19, 2015, midnight |
No |
Reported a laser sampling problem since beginning of Nov. |
coleen |
June 10, 2015, midnight |
Yes |
The sliding roof was repaired on May 19.(No data from March 2 to May 18, 2015) |
kawakami |
March 4, 2015, midnight |
No |
The sliding roof of the solar tracker is broken (March 2~). |
kawakami |
July 18, 2013, midnight |
Yes |
A laser board(ECL04) was installed on July 27, 2011. The laser was exchanged on January 12, 2013. |
kawakami |
June 8, 2011, midnight |
Yes |
some maintenances will be anticipated |
kawakami |
June 8, 2011, midnight |
Yes |
|
kawakami |
Dec. 23, 2010, midnight |
No |
To be operational sometime in 2011. No earlier than May. The instrument is currently in Tsukuba. |
kawakami |
Dec. 22, 2010, midnight |
No |
To be operational sometime in 2011. The instrument is currently in Tsukuba. |
dwunch |